July 27, 2000 6:30am - Tim arrives and starts preparing the lumber for the floor joist. Alfords arrives around 9:00 to spray the block for termites, then the guys start working. Teays Valley Heating & Cooling arrive to lay the new duct work. Jay had to remove the bathroom widow in the shower because the new bedroom wall hit dead center on the window. Now, we will have to try and match up the tile. The guys took a break from the heat around 3:00pm so, Jay, Tim and I went looking at siding and windows. We ordered a dump truck full of gravel for our neighbor’s driveway, but it ended up looking more like dirt than gravel. They finished up the bedroom floor and walls and living room floor joists around 7:30 pm.