July 26, 2000 7:30am - Crew arrives and starts laying block. They send Jay to pick up some additional block that was not delivered, twice. I shoveled dirt on the riverbank. The block layer shows around 3:00, Tim wanted him to come earlier. Jay and I filled in the patio area and around the footers with dirt. They finished up the foundation around 7:30.

July 27, 2000 6:30am - Tim arrives and starts preparing the lumber for the floor joist. Alfords arrives around 9:00 to spray the block for termites, then the guys start working. Teays Valley Heating & Cooling arrive to lay the new duct work. Jay had to remove the bathroom widow in the shower because the new bedroom wall hit dead center on the window. Now, we will have to try and match up the tile. The guys took a break from the heat around 3:00pm so, Jay, Tim and I went looking at siding and windows. We ordered a dump truck full of gravel for our neighbor’s driveway, but it ended up looking more like dirt than gravel. They finished up the bedroom floor and walls and living room floor joists around 7:30 pm.

 

This page was created with ArcSoft PhotoBase.

Home Travel Pictures Wedding Pictures Star Trek This Old House New Years Eve 1999 NewYear2000 Bimini 2000 Halloween 2000 Boating Regatta 2001 Halloween 2001